Skip to main content
1300 416 313 | Servicing Sydney, Melbourne & Brisbane

Tugun Bypass

Project Details

Category
  • Hydro Demolition
Hitech Industrial Services was contracted to carry out hydro-demolition and ultra-high pressure (UHP) water jetting during the construction of the Tugun Bypass project(QLD) . Hydro-demolition was carried out on the structural tunnel walls in order to expose cup links to be for the attachment of reinforcing steel for concrete pours.

More Projects

  • Sydney Jetty Works

    Hitech Industrial Services carried out Hydro Demolition works to the deck of an existing jetty, in preparation for the installation of new service hatches.

  • Coastal Bridge Bearings

    Hitech were required to carry out hydro demolition of concrete to allow for the removal of two bridge bearings.

  • Port Botany

    Hitech was contracted to carry out Hydrodemolition on a rail beam at Port Botany Terminal 3.

  • Cockatoo Island

    Hitech Industrial Services was contracted by to remove areas of concrete that had been identified as suffering from concrete cancer at Cockatoo Island.