Majura Parkway
Hitech was awarded this project at the Majura Parkway upgrade in the ACT, due to our unrivalled robotic concrete removal rates. The area of concrete had to be taken out so the stressing cable duct could be lowered in the slab. Hitech utilized its Aqua cutter robot and handgun for cleaning up any shadows. A total of 3.2m3 of concrete was demolished.