Northern Coastline NSW Marine Works
Hitech was engaged to remove the concrete beneath a steel plate in a concrete dolphin, located on the coastline of NSW.
Hitech needed to expose the reinforced steel pins without causing any damage to them. We successfully removed the concrete via handgun, with a two-man crew, allowing for repairs and reconstruction.
Extra flooring was also required to be removed along with sections of the concrete chamfer, due to cracks caused by ships docking. Encapsulation and filtration systems were put in place, by means of geofabric to ensure wastewater did not enter the ocean.