Skip to main content

Wind Farm

The collaboration of robotic and hand lancing is a great demonstration of the effectiveness of hydro demolition. This project required the removal of concrete from a wind turbine base to a cut depth of 900mm. The outer face being cut by the robotic aquacutter leaving the rebar intact and then extending the beams on the robot to reach the centre of the concrete base. Finally any shadow areas and excess concrete is removed by hand lancing.

Need Advice or a Quote ?

Contact us to learn more about water filtration on your next project